An office move with fewer interruptions to daily operations

An office move affects every person and every system on the same day. Computers, the network, printers, the server and the internet connection all have to work together at the new address before staff can serve clients again. We manage the IT side of the move as one planned project, with a written plan, a labelled inventory and one team accountable for the result.

What we do

Plan the move

We review both offices, the floor plan and the move date, and prepare a written plan that sets out who does what and in which order.

Label and document

Every computer, monitor, cable set and piece of network equipment is labelled with its new seat or location, and the current set-up is documented before anything is unplugged.

Shut down and disconnect

We shut down the server and the computers in the correct order and disconnect the equipment at the current office, so it is ready to be packed.

Pack and move

Servers and network equipment are securely packed, labelled and moved by our team. Computers are moved either by our team or by the organization and its movers, as agreed in the plan.

Set up each seat

We set up computers, monitors, docking stations, printers and desk phones at each seat, and work with your phone provider on the phone service itself.

Install the network and server

We install the switches, the Wi-Fi, the server and the firewall, the device that controls what traffic can enter and leave the office network.

Network cabling for the new office

We install network cabling for new offices, so every seat, printer and wireless access point has a working connection before move day.

Test every workstation

Each workstation is tested at its new seat: sign-in, network and internet access, shared files and printing.

First-morning support

First-morning support is planned with the organization and set out in the written quote, so there is a clear plan for the items that only appear once staff sign in.

What we move

  • Servers
  • Switches, the equipment that connects computers and printers to the office network
  • Firewalls
  • Wireless access points, the devices that provide Wi-Fi across the office
  • Small office printers and scanners
  • Monitors
  • Televisions, including meeting room displays
  • Workstations
  • Server racks and cabinets, assessed at the site visit and set out in the written quote

Two ways to move your computers

The organization chooses the option that suits its move. Both are set out in the written quote.

Option 1

You move them, we install them

The organization or its movers take the computers and monitors to the new office. We label everything beforehand, then install, connect and test each workstation at its new seat.

Option 2

We pack, move and install them

Our team packs and labels the computers and monitors, moves them to the new office, and installs, connects and tests each workstation at its new seat.

Servers: handled by us from start to finish

A server holds the files and applications the whole organization depends on, so it stays in our hands for the entire move. We shut it down in the correct order, pack it securely, label it, move it and install it at the new office. Switches, firewalls and wireless access points are moved and installed by our team in the same way. We then confirm that staff can reach their files and applications before the first working day.

The move in three stages

Stage 1 · Before the move
  • Site visit and review of both offices and the floor plan
  • Written plan and written quote
  • Inventory and labelling of equipment
  • Network cabling installed at the new office where it is part of the project
  • Confirmation that internet service is ready at the new address
Stage 2 · Move day
  • Shutdown and disconnection at the current office
  • Secure packing and moving of the server and network equipment
  • Computers moved by the agreed option
  • Set-up of the network, the server and each workstation at the new office
  • Testing of every workstation
Stage 3 · First day back
  • First-morning support, as set out in the written quote
  • Remaining items resolved and confirmed
  • Retired equipment securely wiped and taken away for recycling
  • Updated record of where each piece of equipment is installed

Checklist for your organization

These items are decided or booked by the organization. Please contact us at least four weeks before the move, because internet service at a new address often takes weeks to install.

  • Internet service: order service at the new address as early as possible, and confirm the installation date before the move date is fixed.
  • Cabling: tell us early if the new office needs network cabling, so it can be quoted and installed before move day.
  • Power and furniture: confirm with your electrician and furniture installer that outlets and desks will be in place at each seat and at the server location before move day.
  • Phone service: tell your phone provider the new address and the move date.
  • Floor plan: provide a floor plan that shows which person sits at which seat, and where printers and shared equipment will be placed.
  • Access: arrange building access, keys or access cards, parking and loading for move day at both addresses.
  • Elevator: book the elevator at both buildings for the move window.
  • Old equipment: tell us which equipment is being retired, so it can be securely wiped and taken away for recycling during the move.
  • Backup: confirm that a current backup of the server and key data is in place before move day.
  • Staff notice: tell staff when systems will be shut down and when they will be available again.

Transparent scope

How the work is quoted

An office IT relocation is project work. It is quoted separately, case by case, and you receive a written quote that is approved in writing before any work begins.

Scheduling

Project work can be scheduled after hours or on weekends, quoted at after-hours project rates.

Network cabling

Network cabling for the new office is part of our service. It is project work, quoted in writing before work starts.

Electrical work and furniture

These are arranged by the organization with its electrician and furniture installer. We provide the IT requirements, such as where power is needed, so the space can be prepared.

Phones

We move and reconnect desk phones. The phone service itself stays with your phone provider, and we work with them on the change of address.

Internet service

Internet service at the new address is ordered by the organization, or with our assistance. We connect and test it as part of the set-up.

Recycling of old equipment

A move is a practical time to retire equipment the organization no longer uses. Old IT equipment can be taken away for recycling during the move at no charge, with data securely wiped first, so retired computers and drives leave the office without company information on them.

Scheduling: evenings and weekends available

Many organizations move outside working hours so that staff finish in one office and start in the next. Project work can be scheduled after hours or on weekends, quoted at after-hours project rates. Our business hours are 9 a.m. to 5 p.m. Pacific Time, Monday to Friday, except statutory holidays.

Service area

We relocate office IT equipment within and between these Lower Mainland cities. Accounting firms, clinics, engineering firms, property managers, non-profit organizations and other professional offices are typical of the offices we support.

VancouverBurnabyRichmondSurreyCoquitlamLangleyNorth VancouverWest VancouverNew WestminsterDeltaMaple RidgeWhite RockPort CoquitlamPort Moody

See the full list on our service areas page.

Frequently asked questions

Who moves the computers?

There are two options. The organization or its movers can move the computers and monitors, and we install, connect and test them at the new office. Alternatively, our team packs, labels, moves and installs them. The chosen option is set out in the written quote.

Who moves the server and the network equipment?

Our team does. We shut the server down in the correct order, pack it securely, label it, move it and install it at the new office, together with the switches, firewalls and wireless access points. We then confirm that staff can reach their files and applications.

Can the move take place on an evening or a weekend?

Yes. Project work can be scheduled after hours or on weekends, quoted at after-hours project rates. The schedule is agreed in the written plan.

How is an office IT relocation quoted?

It is project work, quoted separately and case by case. We review both offices and the equipment to be moved, then provide a written quote. Work begins after the quote is approved in writing.

Do you install network cabling at the new office?

Yes. We install network cabling for new offices as project work, quoted in writing before work starts. Electrical work and furniture are arranged by the organization with its electrician and furniture installer, and internet service is ordered by the organization, or with our assistance.

Do you move the desk phones?

Yes. We move and reconnect desk phones, and work with your phone provider on the phone service itself.

How much notice do you need?

Please contact us at least four weeks before the move, because internet service at a new address often takes weeks to install. In that time, order internet service, tell us if the new office needs network cabling, provide a floor plan with a seat for each person, and arrange building access and the elevator booking at both addresses.

Is first-morning support included?

First-morning support is planned with the organization before the move and set out in the written quote.

Do you move server racks and cabinets?

Rack and cabinet moves are assessed at the site visit and set out in the written quote. The servers and network equipment in the rack are packed, moved and installed by our team.

Who is the office move service available to?

The office move service is available to organizations on a Hexafusion plan. Organizations that would like to start a plan can review our plans and request a quote.

Request a quote for your office move

Tell us the two addresses, the number of workstations and the planned move date, ideally four weeks or more ahead. We will review the move and provide a written quote before any work begins. The office move service is available to organizations on a Hexafusion plan. See our plans.

Request a quote

Related services

Network CablingNetwork SupportIT ConsultingManaged IT VancouverBackup and Disaster RecoveryCloud ServicesPlans
Office staff working together at a workstation
Staff at work at their workstations.